Industry
Office
Region
Northeast
Portfolio
120K sq ft commercial office
Challenge
- +2000 individually controlled 1-10 ton capacity R-22 water-source heat pumps
- ~40 tenant comfort complaints per month due to poor temperature control
- +20 equipment failures or replacements per month
- No building management system, rising energy costs and budget pressure
HVAC Copilot Initial Findings
- 100% of monitored equipment ran incompatible operating modes (i.e. cooling on cold day, heating on hot days, simultaneously heating and cooling in the same room)
- 65% of equipment had a refrigerant leak
- 30% of equipment was short-cycling
- Preventative maintenance alert prevented +$1K in failures and replacement parts

Building Wide Savings
As Thalo works with the onsite team to roll out building-wide, significant operational and energy savings are projected:
$145,000
Energy Savings
$169,380
Parts + Materials Savings
$119,200
Eqv. Labor Savings